We supply EV charging stations for commercial parking, fleet depots and public charging sites. Our range includes 120kW DC fast charging, a 60kW charging system with 60kWh battery storage, and AC-connected systems that deliver DC fast charging to vehicles. Selection depends on grid capacity, output voltage, connector type, simultaneous charging demand and site controls. Solar PV and battery storage can also be considered for sites with energy-management requirements.

Request an EV Charging Quote →

EV Charging Supply & Project Support

Quality Control

Check model-specific protection functions, enclosure ratings, test reports and applicable certificates before approving a charging station.

Warranty Coverage

We confirm the warranty period, covered components and service terms for the selected charger and any included battery system.

One-Stop Solution

We can coordinate EV charger selection with solar PV and battery storage requirements for an integrated site design.

Quality Services

We assist with product selection, documentation and technical questions for project procurement and after-sales support.

Charging System Options

Choose the Charging Architecture for Your Site

EV charging equipment must match the vehicle-side DC charging requirement and the available site supply. An AC-connected power architecture can still deliver DC fast charging to the vehicle.

DC FAST CHARGING

Grid-Connected DC Chargers

For commercial sites with suitable electrical capacity. Check the charger's rated output, DC voltage range, connector type, input supply and number of outlets.

Explore DC Fast Charging →
CHARGING + BATTERY

Battery-Integrated EV Charging

Combines DC charging with on-site battery storage. Evaluate usable battery energy, battery recharge power, charging demand and the site's electrical limits.

View 60kW / 60kWh Option →
AC-CONNECTED ARCHITECTURE

AC-Input Fast Charging Systems

AC supply and energy sources feed a charging system that provides DC fast output to vehicles. Confirm the actual input arrangement and available battery or PV interfaces.

Explore AC-Connected Systems →

Model Comparison

Compare EV Charger Configurations

Compare charging power, battery capacity and system architecture. Confirm the exact configuration against the current datasheet before purchase.

Charging Product Published Specification Procurement Focus Product
120kW DC Fast Charging Station 120kW DC output, 200–1000V DC output range, IP55 Grid supply, compatible vehicle connectors, DC output and site installation View product →
EV Charging Solar Station 60kWh 60kW maximum charging power, 60kWh battery, 200–1000V DC charger range Storage capacity, battery recharge sources, charger output and PV interface View product →
AC Fast Charging Station 120kW 120kW class with an AC-connected system architecture and DC fast charging output AC input conditions, energy-source interfaces, output connectors and system controls View product range →

Technical Requirements

EV Charging Station Specifications Buyers Should Check

Charger nameplate power does not determine actual vehicle charging speed by itself. Vehicle acceptance rate, battery state, connector and power sharing can all limit delivered power.

Parameter What to Specify Why It Matters
AC Supply Available voltage, phase, frequency, transformer capacity and site electrical limits Determines charger input compatibility and possible grid upgrades.
DC Output Rated power (kW), voltage window (V), maximum current (A) Must meet the intended vehicles' DC charging requirements.
Connectors CCS1, CCS2, GB/T, CHAdeMO or other market-specific vehicle connectors Connector options vary by exact product and target region.
Charging Outlets Number of guns and simultaneous power-allocation rules Two connectors do not necessarily provide full rated power at both outlets.
Site Demand Expected sessions, vehicle dwell time, arrival peaks and energy per session Supports charger count and power sizing without assuming fixed daily throughput.
Software & Payment OCPP version, connectivity, authentication and backend integration requirements Must be checked with the intended charging network platform.
Environment Outdoor IP rating, temperature range, cooling and available service space Affects equipment placement, derating and maintenance access.
Compliance Target country, applicable EVSE standards and required test documentation Certification scope must match the exact model and installation market.

Applications

Match the Charger to How Vehicles Use the Site

Public Charging

Plan for variable vehicle models, peak traffic, clear instructions, connector access and charging-network integration.

Fleet Depots

Use arrival times, route schedules, vehicle battery sizes and available depot power to set charger quantity and output.

Commercial Parking

Consider typical parking duration, access control, payment needs and the distance from the electrical distribution point.

Solar + Storage Sites

Coordinate PV generation, battery capacity, charging schedules and the utility connection with the energy-management strategy.

PV & Storage Integration

Plan Charging Power and Energy Storage Together

For solar-powered charging, we review EV energy demand separately from the PV array and battery system. Charger output is measured in kW; battery capacity is measured in kWh. Both are needed to check how the station will operate during busy periods and low solar generation.

  • Check the grid connection and maximum permitted demand.
  • Estimate site charging energy by hour, not only by day.
  • Match PV output and battery usable capacity to the operating schedule.
  • Confirm PCS, BMS and charger control interfaces by model.
  • Review the power-management and grid-islanding requirements.
  • Verify charging availability against the proposed system design.

Procurement Process

From Site Electrical Data to an Approved Charger Order

01

Define the Operation

Confirm vehicle types, typical dwell times and the required number of simultaneous sessions.

02

Check the Supply

Share the electrical single-line diagram, input voltage, grid capacity and any PV or battery plans.

03

Approve Compatibility

Review connector options, output voltage, software, safety and destination-market documents.

04

Confirm the Purchase

Agree on the model, accessory list, packaging, installation documents, quantity and delivery conditions.

Buyer Questions

EV Charging Station FAQ

Is an AC-architecture fast charging station the same as an AC wallbox?
+

No. AC architecture describes part of the system power arrangement. A station may accept AC input and still provide DC fast charging to vehicles. Confirm the actual vehicle-side output and connector type before selecting a model.

How do I choose between 60kW and 120kW EV charging equipment?
+

Compare available grid power, expected charging sessions, vehicle acceptance limits, dwell time and simultaneous charging demand. The rated output alone does not determine how long every vehicle will take to charge.

Which EV charging connectors are available?
+

The appropriate connector depends on the target market and model. Tell us whether CCS1, CCS2, GB/T, CHAdeMO or another interface is needed so the exact charger configuration can be checked.

Can two vehicles charge at full rated power at the same time?
+

Not necessarily. A dual-outlet charger may share its total output power between vehicles. Check the number of outlets, individual connector current limits and the model's power-allocation rules.

When should an EV charging project include battery storage or solar PV?
+

PV or storage may be considered when the site has suitable solar resources, a limited grid connection or a particular load-management objective. System sizing depends on charging energy demand, PV generation, battery power and usable battery capacity.

Can the charger connect to our charging management or payment platform?
+

Backend compatibility depends on the charger's OCPP version, connectivity, firmware and the operator's platform. Provide the required protocol and integration functions so they can be checked for the selected model.

What documents should be checked before importing EV charging stations?
+

Confirm the destination market's electrical and EVSE requirements, exact model certifications, test reports, installation manuals, labeling and, where batteries are included, the relevant transport documents.

Request a Quote

Send Your EV Charging Project Requirements

We can review suitable charger models and system arrangements once the site supply and charging demand are defined.

  • Destination country and installation location
  • Public charging, commercial parking or fleet application
  • Available grid voltage, phase and connection capacity
  • Target output power and number of charging outlets
  • Connector requirements and vehicle types
  • Expected sessions, dwell time and site operating hours
  • PV, battery storage or energy-management needs
  • Quantity, platform requirements and target delivery

Request an EV Charging Quotation

Please include the required charging power, number of outlets, vehicle connector, grid input, quantity, destination country, intended software platform and any site drawings or project specifications.

 